← Back to Explore WorkProgram Documentation

Waste-to-Product

Aligned Global Goals

Industry, Innovation and Infrastructure
UN SDG GOAL 09Industry, Innovation and Infrastructure
Responsible Consumption and Production
UN SDG GOAL 012Responsible Consumption and Production
Green Soldier's activities contribute to the UN Sustainable Development Goals through recycling, education, and waste management.

At PT Raja Besi’s upcycling workshop, equipment design and production trials turn suitable plastic into paving and school furniture.

Green Soldier’s upcycling hub operates in PT Raja Besi’s workshop. Production work begins with equipment design. Our production documentation includes CAD drawings for the shredder and screw-melting machine. Technical drawings translate those designs into parts for the workshop.

The manufacturing process includes material selection, turning, milling, and machine assembly, including drive components and shredding blades. Separate photographs document the melting equipment and the press used to form recycled-plastic boards. PT Raja Besi supported the wider project through equipment access and technicians.

Production trials identified moulding defects, leading to adjustments in the fabrication process. Silicone treatment of the mould was proposed, and later photographs show finished paving after repeated trials. These trial records do not include a measured defect rate or strength-test results. The finished paving shown here remains part of product development, without a certified material specification.

The first school equipment used plastic collected from factory employees. Other project footage records preparation and washing before shredding. Formed panels are finished and combined with frames to make school equipment. The records below bring that material route together with the machine-development sequence.

Future production records can track plastic input, finished output, operating time, and rework. Recording the number of items inspected will also support quality checks. Mass yield equals accepted product mass divided by input plastic mass. Throughput equals accepted product mass divided by operating hours. Rework share equals the number of items requiring rework divided by the number inspected.

These measures connect quality with capacity planning. A schedule based on accepted output would account for rework time and machine availability. Production rates and unit costs will be evaluated using batch-level material and operating records.

Tahapan Proses Pembuatan Paving Plastik (Stages of Plastic Paving Production). Green Soldier production workbook and accompanying four-page PDF. The English records below retain the original CAD drawings and workshop photographs.

FIELD DOCUMENTATION & EVIDENCE

Field Documentation & Photo Gallery

Photographic evidence and field documentation of circular system implementation and student activities across pilot schools.

Handling finished recycled-plastic furniture
PHOTO 01Handling finished recycled-plastic furniture
Workshop processing
PHOTO 02Workshop processing
Panel finishing
PHOTO 03Panel finishing
Recycled-plastic desk
PHOTO 04Recycled-plastic desk
Equipment development
PHOTO 05Equipment development
Trials and finished paving
PHOTO 06Trials and finished paving
Production equations
PHOTO 07Production equations
Team activity in the recycled-product workshop
PHOTO 08Team activity in the recycled-product workshop
Panel finishing beside furniture frames
PHOTO 09Panel finishing beside furniture frames